Blog

This is a work of special significance that extends the coastal path and links the urban area with the Playa Read more
The Roses walkway brings us closer to geological heritage. Read more
Protecting the train tracks from falling rocks and landslides is one of our priorities. Read more
After the derailment of a train caused by a landslide, we carry out an extensive rock scaling using airbags. Read more
Designed from the Urals Model, its 17 meters long connect Salardú with the district of Unha. Read more
The Pays de Toys Valley (France) was affected by the floods of October 2012 and June 2013. Read more
The hanging footbridge, 100 m long, connects two villages separated by the Pas River. Read more
iMuntanya has built two sections of footbridges that allow us to recover and secure sections of the Camí de Ronda. Read more
The "Windsor" suspended bridge has been inaugurated. Its conception, manufacture and assembly were entrusted to iMuntanya. Read more
This is a work of special significance that extends the coastal path and links the urban area with the Playa Read more
The Roses walkway brings us closer to geological heritage. Read more
Protecting the train tracks from falling rocks and landslides is one of our priorities. Read more
After the derailment of a train caused by a landslide, we carry out an extensive rock scaling using airbags. Read more
Designed from the Urals Model, its 17 meters long connect Salardú with the district of Unha. Read more
The Pays de Toys Valley (France) was affected by the floods of October 2012 and June 2013. Read more
The hanging footbridge, 100 m long, connects two villages separated by the Pas River. Read more
iMuntanya has built two sections of footbridges that allow us to recover and secure sections of the Camí de Ronda. Read more
The "Windsor" suspended bridge has been inaugurated. Its conception, manufacture and assembly were entrusted to iMuntanya. Read more
Logo de Infraestructures de Muntanya S.L.

+34 973 60 48 18
imuntanya@imuntanya.com

Polígon Industrial Els Plans
Carretera Castellnou N-II
25265 Castellnou de Seana (Lleida)

Logo ISO 9001Logo ISO 14001
Execution of works in mountainous areas and / or difficult to access

Welding qualification certificate

Collaborators

Infraestructures de Muntanya, S.L. has been a beneficiary of the European Regional Development Fund whose objective is to improve the competitiveness of SMEs and thanks to which it has launched an Internationalization Plan with the aim of improving its competitive position abroad during the year 2020. For this it has counted with the support of the XPANDE Program of the Lleida Chamber of Commerce.

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.plugin cookies

ACEPTAR
Aviso de cookies